Pages

Showing posts with label floors. Show all posts
Showing posts with label floors. Show all posts

Friday, October 31, 2014

Day 9:

Making a mountain out of a mole hill.

The crew came back today to install the concrete board on the floor.




According to the installer, there is a mountain under our house. The floors aren't level. Three different contractors have told me the same thing. However, each of them pointed to different places where the floor rises. Evidently there is a mountain range under our Florida home. Funny thing, I never noticed any dips or raises on the kitchen floor. 



I asked the installer if the boards would make the floors level for the travertine. Travertine is a soft stone and can crack and chip easily. He said there is no way to make that floor level. And he left it there and walked away. After my initial freak out of "OMG, why are we installing travertine on a lumpy floor", he explained to me that the boards will make it flat. Which will be fine for travertine. So evidently there is a difference between flat and level in contractor language.
I asked him if the travertine needed to be sealed. He said, yes, travertine needs to be sealed initially and redone once a year forever. But, he didn't factor sealing the travertine into the estimate. WTF!!!!

Tips for Travertine: Don't drop anything heavy on it, no stilletto heels, and don't install near an airport.

These floors will be the death of me.

Tuesday, October 28, 2014

Day 7

I got home late from Ft. Meyers last night. The only thing I noticed before going straight to bed was a fine layer of dust on everything. The plastic is not doing it's job.

 And I got up this morning to find something missing from the bathroom.


Good thing we have a privacy fence. 


                                            

They arrived early today to work on the floors again. Chiseling, hammering, scraping, repeat. Over and over and over. All day long.
The island is gone. And so is my patience.



Lesson learned: Make sure you get a final estimate on installation BEFORE they break up your existing floor.


Monday, October 27, 2014

Day 6:

Hell Day has arrived. Deconstruction has begun. They started tearing out the tile on the floor at 8:00 am this morning. It sounds like a dentist working at 140 decibels. Drilling and hammering and drilling and hammering. Interrupted by the occasional burping and farting. Yes, burping and farting. Evidently all that chiseling loosens up body gas.


Lesson learned: tell the contractors not to eat Mexican food before chiseling out your floors. Stinky!

I'm leaving town!